Defect library
Floors defects in new builds
Floor defects range from a creaking board to a level change at a doorway that someone could trip on. Walk every room slowly and listen, then check the edges where flooring meets thresholds, skirting and kitchen units.
Updated 19 October 2026
SiteSnag’s library has 16 entries under floors, and 1 of them are marked as safety or critical items. They’re listed below with the most serious first. Each one gives the wording an inspector would put in a report and the trade that would fix it, and 12 carry a reference to the standard or guidance they relate to. The references help you look up the relevant section and aren’t a statement that a particular home does or doesn’t comply.
All 16 entries
Level change at threshold (trip hazard)
SafetyUneven level change between floor finishes creates a trip hazard. Fit suitable threshold.
- Trade
- Flooring
- Reference
- None listed
Uneven floor
ModerateFloor is noticeably uneven. Investigate and level.
- Trade
- Flooring
- Reference
- NHBC Standards 9.3
Damaged floor covering
ModerateFloor covering is scratched, chipped or torn. Repair or replace.
- Trade
- Flooring
- Reference
- NHBC Standards 9.3
Floor bounce / deflection
ModerateFloor deflects noticeably underfoot. Investigate joists/fixings and stiffen.
- Trade
- Carpenter / Joiner
- Reference
- NHBC Standards 6.4
Screed cracked / hollow
ModerateScreed cracked or sounds hollow. Investigate and repair.
- Trade
- Flooring contractor
- Reference
- NHBC Standards 9.3
Squeaking floor
MinorFloor squeaks when walked on. Re-fix boards/joists.
- Trade
- Carpenter / Joiner
- Reference
- NHBC Standards 6.4
Threshold strip loose / missing
MinorThreshold strip is loose or missing. Fit/secure threshold.
- Trade
- Flooring
- Reference
- NHBC Standards 9.3
Gaps in laminate / timber flooring
MinorGaps opening between boards. Re-lay or repair.
- Trade
- Flooring
- Reference
- NHBC Standards 9.3
Carpet seam visible / lifting
MinorCarpet seam visible or edge lifting from gripper. Re-stretch or re-seam.
- Trade
- Flooring
- Reference
- None listed
Vinyl lifting / bubbling
MinorVinyl/LVT lifting or bubbling. Re-bond or replace.
- Trade
- Flooring
- Reference
- None listed
Floorboards loose / creaking
MinorFloorboards move or creak underfoot. Re-fix with screws.
- Trade
- Carpenter / Joiner
- Reference
- NHBC Standards 6.4
Floor not level at doorway
MinorFloor level changes at doorway. Make good and fit threshold.
- Trade
- Flooring contractor
- Reference
- NHBC Standards 9.3
Engineered / timber floor damaged
MinorTimber floor scratched, dented or lifting. Repair or replace boards.
- Trade
- Flooring contractor
- Reference
- NHBC Standards 9.3
Laminate expansion gap missing
MinorNo expansion gap at edges so laminate is lifting. Trim and refit.
- Trade
- Flooring contractor
- Reference
- NHBC Standards 9.3
Carpet gripper exposed / carpet loose
MinorCarpet loose or gripper exposed. Re-stretch and refit.
- Trade
- Flooring contractor
- Reference
- NHBC Standards 9.3
Flooring not under appliances / units
MinorFloor covering stops short or not continued under appliances. Make good.
- Trade
- Flooring contractor
- Reference
- None listed
Using these in a report
In the SiteSnag app, starting to type a defect title in the camera brings up these entries. Picking one fills in the description, severity, trade and reference, and you can edit the wording or add your own defects to the library. Every snag then goes into the branded PDF report with its photos and a numbered pin on the floor plan.
For a room-by-room walk-round, use the new build snagging checklist, or go back to all defect categories.
Other categories
Previous: Windows & glazing (22). Next: Tiling (12).
- Decoration (20)
- Walls & ceilings (19)
- Doors & joinery (38)
- Windows & glazing (22)
- Tiling (12)
- Kitchen (42)
- Bathroom (29)
- Plumbing (17)
- Heating (15)
- Electrical (28)
- External (33)
- General (9)
- Ventilation (6)
- Insulation & damp (10)
- Roofing (18)
- Drainage (8)
- Garage (5)
- Fire safety (17)
- Accessibility (8)
- Commercial fit-out (10)
- Mechanical & electrical (11)
- Lifts & doors (5)
- Car park & external works (7)
- Signage & security (6)
- Fitted furniture (7)
- Stairs (6)
- Structure (8)
- Timber & pests (8)
- Communal areas (6)